【政策法规】山东省能源局_通知公告_关于征集2023年度新型储能入库项目(第一批)的通知_4页_329kb
报告摘要
Summary of Shandong Province Energy Bureau's Notice on Collecting Novel Energy Storage Projects (2023 Batch)
Purpose and Background
The notice, published on April 10, 2023, by the Shandong Province Energy Bureau, aims to promote the orderly development of novel energy storage and scientifically implement projects based on the "Shandong Province Novel Energy Storage Engineering Development Action Plan." It calls for projects to be submitted for inclusion in a catalog.
Eligibility and Project Requirements
Projects must be registered companies in Shandong Province with no history of quality, safety, or environmental incidents in the past year. They must align with regional energy plans and have completed preliminary steps like approval and land acquisition. Each city can submit up to three projects, excluding entities already involved in demonstration projects.
Eligible project types include:
- Lithium battery storage (min. 50,000 kW capacity, 2-hour discharge), compressed air energy storage (min. 100,000 kW, 4-hour duration), vanadium flow batteries (min. 30,000 kW).
- Distributed storage (min. 50,000 kW), coal thermal storage (min. 50,000 kW depth for peak shaving), hydrogen production projects (min. 30,000 kW electrolysis), and other emerging technologies like aluminum-ion batteries (min. 30,000 kW).
A specific category for frequency regulation uses lithium, supercapacitors, or flywheels (min. 90 kW). All projects must be operational by May 30, 2024, for lithium-based ones, and by December 2024 for others, with integration into a provincial monitoring system.
Innovation and Operational Standards
Projects must demonstrate innovation in application or operation. Safety is paramount, requiring approved equipment, comprehensive safety measures, fire detection systems, and qualified service providers based on voltage levels. Projects must have ready access to construction and meet grid integration criteria.
Application and Review Process
Applications must be submitted by city energy authorities by April 21, 2023, including detailed declarations and summary tables. The provincial bureau will conduct an expert review and potential third-party evaluation, with results published and verified.
Oversight and Reporting
Cities are tasked with monitoring project progress, reporting monthly updates, and submitting post-completion summaries within one month of completion. A dynamic project database requires projects to show physical progress; failure to do so may lead to removal. Cities must designate contact personnel for coordination.
Timeline and Contacts
Key deadline is April 21, 2023, for initial submissions to the Shandong Province Energy Bureau. Contact details include a point person and phone/email for inquiries.
试读结束,高清完整版pdf/doc/ppt,请点下载