EBA欧洲银行-02.-Technical-Specifications_46页_665kb
报告摘要
Summary of EBA Catering Services Tender
Core Content
The European Banking Authority (EBA) is seeking a catering services provider to supply food, beverages, and related supplies for its meetings held at its London premises. This tender aims to establish a framework contract to ensure consistent, high-quality catering services across all events, with a focus on variety, customer service, and compliance with health, safety, and environmental standards.
Main Services and Scope
The catering services must include:
- Food and Beverages: Four prepared lunch options (cold buffet, sandwich, canapés and light bites, warm bowl), along with two drinks packages (welcome drinks and wine).
- Supplies: A detailed list of required catering items including coffee, tea, milk, non-alcoholic drinks, sugar, condiments, and disposable items.
- Staff: Trained catering personnel to manage food setups, service, and cleanup, with a requirement for two staff members on busy days.
The contractor must also:
- Ensure food is fresh, diverse, and meets dietary requirements (e.g., vegetarian, gluten-free).
- Provide on-site support during meetings, including setup, service, and cleanup.
- Follow strict health and hygiene protocols, including the use of approved equipment and safe food handling practices.
- Adhere to recycling and environmental guidelines, using minimal packaging and recyclable materials.
Key Requirements
1. Facilities at the EBA
- Meeting rooms: Picasso (68, up to 150), Van Gogh (48), Cezanne (44), Klimt (28), Munter (28), Modigliani (20), Gallen-Kallela (10).
- Breakout areas: North (14 high tables, 3 counters, 1 buffet) and South (18 high tables, 3 counters, 2 buffets).
- Kitchen facilities: Large fridge, dishwashers, sinks, and table space.
- Equipment: Coffee machines, cutlery, crockery, and glasses.
2. Service Delivery
- Deliveries must occur in the morning, 30 minutes before the event starts.
- Staff must be present to manage coffee and lunch breaks, and ensure cleanliness and order.
- All waste must be removed on the same day to maintain hygiene standards.
3. Health and Safety
- Compliance with all applicable food safety, health, and hygiene regulations.
- Use of gas burners and burning paste for keeping food warm is permitted, but only under supervision.
- Fire safety equipment (CO2 fire extinguisher) must be available on-site.
- Prohibited equipment includes fan ovens and other items that emit smoke or steam.
4. Environmental and Recycling Standards
- Minimal packaging and maximum use of recyclable materials.
- Reusable or recyclable bottles for beverages.
- Waste management is a key responsibility.
5. Quality Assurance
- The quality and presentation of food must match the standards set during the tasting session.
- Feedback from participants will be communicated to the contractor.
Procurement and Contractual Details
- Tender Submission: Must include all required forms and documentation (Annexes I to X).
- Language: All submissions must be in English.
- Purchase Order Workflow: Purchase orders are issued weekly, with a requirement for signed and dated confirmation within two working days.
- Invoicing: Invoices must be detailed and submitted monthly, with a single point of contact designated.
- Reporting: Monthly account statements are required alongside invoices.
- Performance Management: A contract manager must be appointed to handle all contractual matters, including communication, orders, and invoicing.
Exclusion and Selection Criteria
- Exclusion Criteria: Tenderers must not be excluded under EU procurement rules, and must provide evidence of compliance with legal, financial, and technical requirements.
- Selection Criteria: Include legal capacity, financial stability, technical capability, and the ability to meet the technical and price requirements. The final award is based on a combination of technical merit and price.
Indicative Volumes (2016)
| Item | Description | Monthly Quantity | Annual Quantity |
|---|---|---|---|
| 1 | Fresh semi-skimmed milk (pint) | 10 per day | 2,500 |
| 2 | Fresh semi-skimmed milk (litre) | 2 per day | 500 |
| 3 | Biscuits (varieties) | 5 per month | 55 |
| 4 | Luxury biscuits | 4 per month | 44 |
| 5 | Napkins (2 ply, 33cm) | 4 per month | 48 |
| 6 | Still mineral water (1L) | 525 per month | 5,775 |
| 7 | Sparkling mineral water (1L) | 525 per month | 5,775 |
| 8 | Orange juice (1L) | 12 per month | 132 |
| 9 | Apple juice (1L) | 12 per month | 132 |
| 10 | Cranberry juice (1L) | 12 per month | 132 |
| 11 | English Breakfast tea | 1 per month | 11 |
| 12 | Espresso coffee beans | 50 per month | 590 |
| 13 | White sugar sachets | 2 per month | 18 |
| 14 | Brown sugar sachets | 2 per month | 11 |
| 15 | Milk cups (120ml) | 30 per month | 390 |
| 16 | Chamomile tea | 2 per month | 22 |
| 17 | Spearmint tea | 2 per month | 22 |
| 18 | Red fruit tea | 2 per month | 22 |
| 19 | Lemon tea | 2 per month | 22 |
| 20 | Salt sachets | 6 per year | 6 |
| 21 | Black pepper sachets | 6 per year | 6 |
| 22 | Coke (330ml) | 2 per month | 22 |
| 23 | Diet Coke (330ml) | 2 per month | 22 |
| 24 | Sprite (330ml) | 1 per month | 11 |
| 25 | PG Tips tea bags | 2 per year | 2 |
| 26 | White paper doilies (25cm) | 10 per year | 10 |
| 27 | White paper doilies (11cm) | 1 per year | 1 |
Tender Timeline
| Activity | Date | Comments |
|---|---|---|
| Tender Launch | 03/02/2016 | Contract notice dispatched to the EU Official Journal |
| Last Clarification Date | 08/03/2016 | Six working days before submission deadline |
| Deadline for Tender Submission | 16/03/2016 | 17:00 local time in London |
| Tender Opening | 22/03/2016 | 10:00 UK time |
| Tasting Session | April 2016 | For shortlisted tenderers |
| Tender Evaluation Completion | May 2016 | Indicative only |
| Contract Signature | May 2016 | Indicative only |
Additional Notes
- The tenderer must be able to source any additional products not listed in the specifications, provided they remain within the framework contract.
- The EBA will provide entry passes to contractors' staff and information on emergency procedures.
- Contractors must ensure timely delivery and compliance with all EBA rules and standards.
展开完整摘要
试读结束,高清完整版pdf/doc/ppt,请点下载