2017亚太区居住者成本指南(英文版)_35页-10mb
报告摘要
ASIA PACIFIC CORPORATE REAL ESTATE COST GUIDE (2017/18 EDITION)
Core Content Overview
This document provides a comprehensive overview of the costs associated with corporate real estate in 25 cities across the Asia Pacific region. It includes fit-out, leasing, and facilities management (FM) costs, as well as a net present lifecycle cost (NPLCC) analysis. The guide is intended to support capital planning and decision-making for real estate professionals and corporate clients by offering data-driven insights into cost benchmarking and project timelines.
Main Points and Key Information
1. Introduction and Purpose
- The guide is developed from empirical data and aims to help companies understand capital cost differences and provide a reference for cost benchmarking.
- It includes cost indices for key areas: capital, leasing, and operating costs, as well as a holistic cost in present value.
2. Fit-Out Costs
- Fit-out costs are based on standard categories including consultants fees, builders works, M&E works (structured cabling), and FF&E.
- Exclusions include AV/IT/telephony equipment, dedicated chiller and generator installation, and other specialized services.
- The APAC Fit-Out Cost Index includes basic, medium, high, and reinstatement cost categories for each city.
Fit-Out Cost Benchmarks (US$/sq ft)
| Region | Country | City | Basic | Medium | High | Reinstatement |
|---|---|---|---|---|---|---|
| North Asia | South Korea | Seoul | 95 | 133 | 172 | 12 |
| North Asia | Japan | Tokyo | 88 | 133 | 195 | 44 |
| Greater China | China | Beijing | 78 | 113 | 169 | 13 |
| Greater China | China | Shanghai | 73 | 102 | 153 | 12 |
| Greater China | China | Guangzhou | 70 | 104 | 160 | 11 |
| Greater China | Taiwan | Taipei | 67 | 89 | 116 | 11 |
| Greater China | Hong Kong | Hong Kong | 86 | 128 | 200 | 23 |
| Pacific | Australia | Sydney | 98 | 138 | 189 | 17 |
| Pacific | Australia | Melbourne | 75 | 105 | 144 | 14 |
| Pacific | Australia | Perth | 91 | 137 | 184 | 14 |
| Pacific | Australia | Brisbane | 72 | 102 | 138 | 14 |
| Pacific | New Zealand | Auckland | 66 | 115 | 164 | 15 |
| South East Asia | Philippines | Manila | 56 | 97 | 139 | 9 |
| South East Asia | Vietnam | HCMC | 64 | 88 | 110 | 3 |
| South East Asia | Indonesia | Jakarta | 59 | 83 | 113 | 5 |
| South East Asia | Malaysia | Kuala Lumpur | 69 | 94 | 136 | 14 |
| South East Asia | Singapore | Singapore | 80 | 108 | 127 | 14 |
| South East Asia | Thailand | Bangkok | 48 | 87 | 138 | 10 |
| South Asia | India | Mumbai | 52 | 75 | 95 | 3 |
| South Asia | India | Hyderabad/Kolkata/Pune | 46 | 61 | 80 | 3 |
| South Asia | India | Bangalore/Chennai/Delhi | 48 | 68 | 90 | 3 |
3. Leasing Costs
- The leasing cost table provides Prime and Grade A rent figures for each city in US$ per sq ft per annum.
- These figures are based on Net Floor Area and reflect market practices, with Prime rent being for the highest-quality office space in prime locations.
Leasing Cost Benchmarks (US$ per sq ft per annum)
| City | Prime | Grade A |
|---|---|---|
| Hong Kong | 269 | 197 |
| Tokyo | 132 | 98 |
| Beijing | 174 | 88 |
| Shanghai | 120 | 80 |
| Singapore | 68 | 78 |
| Delhi | 111 | 73 |
| Mumbai - BKC | 84 | 66 |
| Sydney | 83 | 47 |
| Taipei | 60 | 45 |
| Seoul | 73 | 44 |
| Guangzhou | 56 | 41 |
| HCMC | 48 | 40 |
| Bangkok | 28 | 32 |
| Bangalore | 37 | 32 |
| Gurgaon | 41 | 28 |
| Melbourne | 42 | 27 |
| Auckland | 38 | 27 |
| Brisbane | 48 | 26 |
| Perth | 47 | 20 |
| Kuala Lumpur | - | 19 |
| Hyderabad | - | 13 |
4. Facilities Management (FM) Costs
- FM costs include cleaning, mechanical & electrical maintenance, security, utilities, pest control, mailroom, reception, and landscaping.
- Exclusions include dedicated chiller and generator maintenance, property tax, and management fees.
- The costs are based on the CBRE Research year-on-year inflation rates and a 10% discount rate for NPLCC analysis.
FM Cost Benchmarks (US$/sq ft per annum)
| Region | Country | City | Basic | Medium | High |
|---|---|---|---|---|---|
| North Asia | South Korea | Seoul | 3.08 | 5.11 | 21.89 |
| North Asia | Japan | Tokyo | 3.20 | 5.34 | 22.97 |
| Greater China | China | Beijing | 3.02 | 5.43 | 24.97 |
| Greater China | China | Shanghai | 3.00 | 5.41 | 24.38 |
| Greater China | China | Guangzhou | 3.04 | 5.47 | 25.15 |
| Greater China | Taiwan | Taipei | 3.05 | 5.51 | 24.98 |
| Greater China | Hong Kong | Hong Kong | 2.45 | 4.24 | 18.30 |
| Pacific | Australia | Sydney | 2.25 | 4.44 | 21.36 |
| Pacific | Australia | Melbourne | 3.39 | 6.59 | 31.28 |
| Pacific | Australia | Perth | 2.67 | 5.21 | 24.70 |
| Pacific | Australia | Brisbane | 2.69 | 5.25 | 24.74 |
| Pacific | New Zealand | Auckland | 2.08 | 4.06 | 19.81 |
| South East Asia | Philippines | Manila | 2.89 | 5.04 | 21.62 |
| South East Asia | Vietnam | HCMC | 2.79 | 4.83 | 20.51 |
| South East Asia | Indonesia | Jakarta | 2.89 | 5.04 | 21.62 |
| South East Asia | Malaysia | Kuala Lumpur | 3.09 | 5.45 | 23.83 |
| South East Asia | Singapore | Singapore | 3.29 | 5.86 | 26.05 |
| South East Asia | Thailand | Bangkok | 2.79 | 4.84 | 20.51 |
| South Asia | India | Mumbai | 2.47 | 4.65 | 20.08 |
| South Asia | India | Hyderabad/Kolkata/Pune | 2.48 | 4.67 | 20.18 |
| South Asia | India | Bangalore/Chennai/Delhi | 2.49 | 4.68 | 20.22 |
5. Project Timelines
- The project timelines are based on the typical procurement strategy and vary by city and office size.
- Timelines are provided in months and are indicative of the period from Project Management appointment to handover and project closeout.
Project Timeline (Months)
| Region | Country | City | 5,001 - 10,000 SF | 10,001 - 20,000 SF | 20,001 - 30,000 SF | 30,001 - 40,000 SF | 40,001 - 50,000 SF | 50,001 - 60,000 SF | 60,001 - 70,000 SF | 70,001 - 80,000 SF | 80,001 - 90,000 SF | 90,001 - 100,000 SF |
|--------------|------------|--------------|------------------|------------------|------------------|------------------|------------------|------------------|------------------|------------------|------------------|------------------|------------------|
| North Asia | South Korea | Seoul | 5 | 6 | 6 | 7 | 8 | 8 | 8 | 9 | 10 | 10 | 14 |
| North Asia | Japan | Tokyo | 6 | 7 | 9 | 9 | 9 | 11 | 11 | 12 | 13.5 | 14 |
| Greater China| China | Beijing | 5 | 5.5 | 6.5 | 7.5 | 8 | 8.5 | 9 | 10 | 11 | 13 |
| Greater China| China | Shanghai | 5 | 6 | 6.5 | 7.5 | 8 | 8.5 | 9 | 10 | 12 | 14 |
| Greater China| China | Guangzhou | 5 | 5.5 | 6 | 7 | 7.5 | 8 | 8 | 9 | 11 | 13 |
| Greater China| Taiwan | Taipei | 4 | 5.5 | 6 | 7 | 7 | 7.5 | 8 | 8 | 9 | 11 |
| Greater China| Hong Kong | Hong Kong | 4 | 5 | 6 | 6.5 | 7.5 | 8 | 8 | 9 | 10 | 13 |
| Pacific | Australia | Sydney | 4 | 5.5 | 6 | 7 | 7.5 | 8 | 9 | 10 | 11 | 13 |
| Pacific | Australia | Melbourne | 4 | 5.5 | 6 | 7 | 7.5 | 8 | 9 | 10 | 11 | 13 |
| Pacific | Australia | Perth | 4 | 5.5 | 6 | 7 | 7.5 | 8 | 9 | 10 | 11 | 13 |
| Pacific | Australia | Brisbane | 4 | 5.5 | 6 | 7 | 7.5 | 8 | 9 | 10 | 11 | 13 |
| Pacific | New Zealand | Auckland | 4 | 5.5 | 6 | 6.5 | 7.5 | 8 | 8.5 | 9 | 10 | 11 |
| South East Asia | Philippines | Manila | 5 | 6 | 6 | 7 | 7.5 | 8 | 8 | 9 | 10 | 13 |
| South East Asia | Vietnam | HCMC | 4 | 5 | 6 | 6 | 7 | 8 | 8.5 | 9 | 9.5 | 11 |
| South East Asia | Indonesia | Jakarta | 6 | 6 | 6 | 6.5 | 7.5 | 8 | 8 | 9 | 10 | 13 |
| South East Asia | Malaysia | Kuala Lumpur | 4 | 5 | 6 | 6.5 | 7.5 | 8 | 8 | 9 | 10 | 13 |
| South East Asia | Singapore | Singapore | 4 | 5 | 6 | 6.5 | 7.5 | 8 | 8 | 9 | 10 | 13 |
| South East Asia | Thailand | Bangkok | 5 | 5.5 | 6 | 6 | 7.5 | 8 | 8.5 | 9 | 10.5 | 14.5 |
| South Asia | India | Mumbai | 5.5 | 6 | 6 | 6 | 6 | 7 | 7 | 7.5 | 7.5 | 8.5 |
| South Asia | India | Hyderabad/Kolkata/Pune | 5.5 | 6 | 6 | 6 | 6 | 7 | 7 | 7.5 | 7.5 | 8.5 |
| South Asia | India | Bangalore/Chennai/Delhi | 5.5 | 6 | 6 | 6 | 6 | 7 | 7 | 7.5 | 7.5 | 8.5 |
6. Net Present Lifecycle Costing (NPLCC)
- The NPLCC model provides a holistic cost estimate for a 5-year commercial office investment across Asia Pacific.
- It includes cost benchmarking for decentralization, comparing CBD and city fringe locations in five cities.
- The NPLCC difference for decentralizing a standard 30,000 sq ft office in Hong Kong is $18,256,113 over a 5-year period.
7. Key Assumptions
-
Fit-Out Costs:
- Office size: 25,000 to 30,000 sq ft
- Density: 1 workstation to 90–110 sq ft
- Fixed desk ratio
- Open plan office
- Raised floor throughout
-
Leasing Costs:
- Prime and Grade A rents based on Net Floor Area
- Excludes service charges and taxes in some cases
-
FM Costs:
- Includes cleaning, maintenance, security, utilities, pest control, etc.
- Excludes dedicated chiller and generator maintenance, property tax, and management fees
-
NPLCC:
- 5-year investment period
- Grade A office building
- Medium standard fit-out and FM services
- 10% discount rate applied
8. Additional Notes
- The data provided is a guide and should not be used for specific project budgeting.
- Contact the CBRE Project Management Division Lead in the relevant city for accurate budget estimates.
- Reinstatement rates vary depending on landlord requirements and project briefs.
Conclusion
The 2017/18 Asia Pacific Cost Guide offers a detailed analysis of corporate real estate costs, including fit-out, leasing, and FM expenses. It emphasizes the importance of technology in modern workplaces and highlights the impact of decentralization on lifecycle costs. The guide is a valuable tool for informed decision-making and planning, with all data based on empirical project analysis and market research.
试读结束,高清完整版pdf/doc/ppt,请点下载