20211014-IRENA-Africa_Clean_Energy_Corridor_Analysis_of_Infrastructure_for_Renewable_Power_in_Eastern_and_Southern_Africa_80页_4mb
报告摘要
Analysis of Infrastructure for Renewable Power Development in Eastern and Southern Africa
Executive Summary
- Africa has significant renewable energy potential, with hydropower being the primary resource.
- Power pools EAPP and SAPP support regional co-operation but face challenges in data availability and institutional capacity.
- Key priorities include renewable energy zoning, coordinated planning, and enabling mechanisms like harmonized regulations.
- Critical transmission gaps limit cross-border energy trade, requiring targeted infrastructure projects and public-private partnerships.
- Capacity building in planning, operations, and project development is essential for sustainable renewable energy integration.
Introduction
- ACEC aims to accelerate renewable energy development aligned with PIDA.
- Zoning high-potential areas for various renewable technologies is crucial.
- Planning processes must balance national and regional interests, considering economic, environmental, and social factors.
- National policies, regulatory harmonization, and risk mitigation are needed to attract investment.
Power Pool Role in Corridor Construction
- EAPP is at an early operational stage; SAPP is more advanced.
- SAPP's role can improve by enhancing regional planning and market mechanisms.
- Both pools need specialized skills for integrated system planning and effective grid operation.
Electricity Sector Status
- Current generation capacity is predominantly thermal-based, with limited renewable deployment.
- Transmission constraints constrain regional power trade, with limited modern grid infrastructure.
- Load forecasts suggest significant growth, but universal access targets may not align.
Renewable Energy Resources and Potential
- Hydropower potential is underutilized (Ethiopia: ~3%, DRC: ~2%).
- Non-hydropower renewable potential is orders of magnitude greater, requiring detailed assessment.
- Priority projects are mainly hydropower, though renewable technology expansion is recommended.
Business Models and Financing
- Traditional state-dominated financing models are insufficient for merchant projects.
- Privatization and public-private partnerships have shown success in other regions.
- Market structures, risk mitigation, and R&D are needed to lower costs and integration barriers.
Institutional Arrangements
- Strengthening regional regulatory bodies like RERA and IRB is essential for policy harmonization.
- National institutions must develop specialized capacities for renewable energy promotion.
- Improving incentive structures and dispute resolution mechanisms will build investor confidence.
Conclusions and Recommendations
- Readiness for ACEC is uneven, with regional co-operation still needing formalization.
- Transmission infrastructure requires significant upgrades to support renewable deployment.
- Institutional capacity and policy frameworks need strengthening for effective implementation.
- Specific recommendations include standardizing data, promoting market mechanisms, and investing in human resources.
展开完整摘要
试读结束,高清完整版pdf/doc/ppt,请点下载