2012-05-31-IRENA-Renewable_Energy_Cost_Analysis_-_Biomass_for_Power_Generation_60页_2mb
报告摘要
IRENA Renewable Energy Cost Analysis: Volume 1 Power Sector Issue 5/5 Wind Power (June 2012)
Based on the submitted document, here is a summary of the key points:
About IRENA
- International Renewable Energy Agency promotes the adoption and sustainable use of renewable energy (bioenergy, geothermal, hydropower, ocean, solar, wind).
Overall Report Objective
- To provide objective cost data and analysis for renewable energy technologies to support policy and investment decisions.
- Part of a five-report series (biomass, wind, hydropower, CSP, PV).
- Focuses on generating electricity cost (LCOE) rather than detailed project finance.
Key Cost Indicators Used
- Investment Costs: Equipment, site work, licensing, working capital, project development, finance costs.
- Operations and Maintenance (O&M): Variable and fixed costs per kWh.
- Feedstock Costs: Price per tonne of fuel.
- Levelised Cost of Electricity (LCOE): Average cost (USD/kWh) over the project lifetime, including all capital, O&M, and fuel costs, discounted to present value.
Current Technologies and Costs (Volume 1 - Biomass Power Generation Focus)
Biomass Combustion Technologies
- Stoker Boilers.
- Fluidised Bed Boilers (Bubbling and Circulating).
- Anaerobic Digestion.
- Biomass Gasification (atmospheric, pressurised).
- Co-firing (biomass with coal/natural gas).
Cost Analysis Details
- Installed Costs ($/kW):
- Stoker Boiler: $1,880 - $4,260.
- Bubbling/CFB Boiler: $2,170 - $4,500.
- Fixed/Fluidised Bed Gasifier: $2,140 - $5,700.
- Landfill Gas: $1,917 - $2,436.
- Anaerobic Digesters: $2,574 - $6,104.
- Co-firing: $140 - $850 ($ incremental investment).
- LCOE ($/kWh):
- Stoker Boiler: $0.06 - $0.21.
- Bubbling/CFB Boiler: $0.07 - $0.21.
- Gasifier: $0.07 - $0.24.
- Landfill Gas: $0.09 - $0.12.
- Anaerobic Digester: $0.06 - $0.15.
- Stoker CHP: $0.07 - $0.29 ($ higher due to heat). Anaerobic Digester CHP: $0.11 - $0.28.
- Co-firing: $0.04 - $0.13 (mix dependent).
- Project Costs Structure:
- Major components: Equipment, Fuel handling/preparation, Civils/road/GRID connection, Consultant/design.
- Generator/converter system typically largest component.
- Plants larger than ~30MW showed decreasing installed costs.
Feedstock Costs and Logistics
- Types: Agricultural residues, forestry residues, municipal waste, energy crops, wood waste, biogas (from AD/LFG), imported pellets.
- Cost Range ($/tonne & $/GJ): $10 (1GJ) to $160 (around).
- Variability: Highest for imported pellets; lower for local waste residues (e.g., bagasse/stover can be free or very low).
- Handling: Preparation costs vary significantly based on feedstock type, moisture, transport costs ( significant fraction of total delivered cost for many types). Dryer or densification reduces transport costs but increases fuel cost by $/GJ.
- Supply Chain: Lack of reliable integrated supply chains is a major barrier for large-scale projects, especially outside Scandinavia.
Market Trends
- Installs (End 2010): Total biomass installed capacity ~54-62 GW globally (representing ~1.2% of total power generation capacity).
- Feedstocks: Dominated by wood combustion.
- Future Projections: Potential growth to ~270 GW by 2030, requiring investment of ~USD 21-35 billion/year. Europe and North America are key players.
- Trade: Growing trade in wood chips (large scale) and pellets. Drivers: Agriculture residues (variable cost, key driver), supportive policies (especially feed-in tariffs or similar support mechanisms).
Policy and Deployment Challenges
- Technology Maturity: Many options mature (e.g., combustion), others less so (e.g., highly integrated gasification).
- Financial Models: Useful for screening projects but often complicated by project-specific (client, country, project type) financial assumptions.
- Investment Knowledge: There has been too little information historically to support accurate cost assessment.
Levelised Cost of Electricity (LCOE)
Methodology
- Discount rate assumed: 10%.
- Lifetime varied (e.g., 20-25 years).
- Capacity factor assumed: 85%.
Findings for Technologies
- Stoker/Energy Crops: Low LCOE ($0.05-0.10/kWh) with low feedstock cost.
- Stoker/Diesel/Gas/Landfill Gas: Average to high LCOE ($0.06-0.21/kWh) depending on fuel cost.
- Gasifier: Wide range, lowest $0.065 could compete with diesel, high might be competitive with gas if steam needed.
- CSP/PV/Hydro: Not covered in this specific report issue (this summary is for the biomass volume report).
Conclusions
- Biomass LCOE varies significantly by technology and feedstock (geographical competition).
- Lower costs achieved where sustained local fuel supply exists.
- Key variables: Feedstock Cost, Technology Cost. Feedstock cost often 40-50%.
- Increasingly displacing or supplementing (co-firing) fossil fuels.
- Ready applicability for various scales, especially off-grid/mini-grid options.
- Role likely to be defined by feedstock location and cost (which outweighs some technical/climatic effects).
52
展开完整摘要
试读结束,高清完整版pdf/doc/ppt,请点下载