2007年-世界发展银行全球_Algeria_-_Public_Expenditure_Review___Assuring_High_Quality_Public_Investment_Volume_2_Annexes_and_Statistical_Annex_162页_9mb
报告摘要
Summary of People's Democratic Republic of Algeria: A Public Expenditure Review (Volume II: Annexes and Statistical Annex)
Core Content
This document is part of the Public Expenditure Review (PER) for the People's Democratic Republic of Algeria, focusing on the PCSC (Programme Complémentaire de Soutien à la Croissance) and its investment execution assumptions for the period 2005–2007. It also includes annexes that cover various sectors such as Water, Transport, Education, and Health, along with acronyms, currency equivalents, and fiscal and statistical information.
Main Sectors and Their Execution Assumptions
1. Water Sector
- Disbursement rates: 12%, 25%, and 32% for 2005, 2006, and 2007 respectively.
- Cumulative execution rate: 21% over 2005–2007.
- Historical average: 52%.
- Key projects:
- Construction of 4 dams (O.E Bouaghi, JIJEL, TEBESSA, Chlef)
- Two transfer projects (Douéra-Mazafran-El Harrach and Boussiaba-Béni Haroun)
- Three water supply conduit projects
- Rehabilitation of DWS networks in 12 cities
- Development of the Tarf plain
- Upwelling of water from Oued Souf and Ourgla Valley
- Studies and technical assistance for water resource management
2. Transport and Public Works
- Execution rates: 14%, 0%, and 25% for 2005, 2006, and 2007 respectively.
- Cumulative execution rate: 56%.
- Key projects:
- National transport plan and traffic studies
- Construction and expansion of 5 fishing ports
- Development of bypass routes in the Algiers region
- Maintenance of national roads and signaling
- Rehabilitation of Trans-Saharan and North rail bypass routes
- Electrification of North bypass route
- Construction of new lines and branch lines in industrial zones
3. Education and Training
- Execution rates: 95% for elementary through secondary education and vocational training; 50% for higher education and scientific research.
- Cumulative execution rate: 50%.
- Key projects:
- Educational and computer equipment procurement
- Construction of laboratory and research center infrastructures
- Scientific equipment procurement
- University-related projects: student capacity, housing, and restaurant facilities
4. Health Sector
- Execution rates: 40%, 48%, and 78% for 2005, 2006, and 2007 respectively.
- Cumulative execution rate: 57%.
- Historical execution rate: 79%.
- Key projects:
- Rehabilitation and development of sanitation networks in 12 cities
- Construction of 6 medical hospitals and 1 psychiatric hospital
- Development of 4 cancer centers and 5 geriatric centers
- Rehabilitation of 11 STEPs (water treatment and purification stations)
Key Findings
- Overall Execution Rate: The weighted average execution rate for the four main sectors (Agriculture and Water Resources, Support for Productive Services, Economic and Administrative Infrastructures, and Education & Training) is 50% for the first three years of the PCSC (2005–2007), which is below the historical average of 65%.
- Discrepancy in Execution Assumptions: The execution assumptions are based on current implementation capacity and actual projects rather than historical data, which may have been inflated.
- Sectoral Challenges:
- Water Sector: Low execution rates due to historically low implementation capacity, despite high government pressure for quick results.
- Education Sector: High execution rates for elementary and secondary education, but lower rates for higher education due to an extremely high proposed budget compared to recent actual expenditures.
- Health Sector: Lower execution rates due to the high budget and potential management constraints.
- Public-Private Partnerships (PPPs): The document highlights the importance of PPPs in infrastructure development, particularly in the transport and water sectors, with mentions of concessions and private sector participation.
Acronyms and Abbreviations
The document includes a comprehensive list of acronyms and abbreviations used in the report, such as:
- AAP: Assessment and Action Plan
- CSR: Comprehensive Spending Review
- DA: Algerian Dinar
- DAEP: Direction de l'Alimentation en Eau Potable
- DEAH: Direction des études et des aménagements hydrauliques
- DGB: Direction Générale du Budget
- DTP: Direction des Travaux Publics de Wilaya
- DRG: Diagnosis-related group
- ETU: Entreprise des Transports Urbains
- WUA: Water user association
- WRR: Water requirement ratio
- WSS: Water supply and sanitation
- WRR: Water requirement ratio
- WRR: Water requirement ratio
Additional Information
- Currency: The local currency unit is the Algerian Dinar (DA), with an exchange rate of 72.6 DA per USD.
- Fiscal Year: January 1 – December 31.
- Metric System: Used for measurements.
- Annexes:
- Annex A: Simulation scenarios for PCSC investment execution.
- Annex B: Key sector investment issues.
- Annex C: Main features of the Algerian budget process.
- Annex D: Railways.
- Annex E: Road infrastructure.
- Annex F: Ports.
- Annex G: Civil aviation.
- Annex H: Water supply and demand.
- Annex I: Outline of Water Law No. 05-12.
- Annex J: General principles of the Water Law.
- Annex K: Organization of the Ministry of Water Resources.
- Annex L: Maintenance norms.
- Annex M: Water fact sheet.
- Annex N: World Bank water sector strategy recommendations.
- Annex O: From vision to action in the water sector.
- Annex P: Education simulation scenarios.
- Annex Q: Summary of education reform program measures.
- Annex R: Functions by level of administration in school education.
- Annex S: Alternative scenarios on the impact of PCSC on higher education.
Conclusion
The report provides a detailed analysis of investment execution assumptions for the PCSC and outlines the sector-specific challenges and opportunities in Algeria. It highlights the need for improved implementation capacity, better coordination, and enhanced expenditure efficiency to meet the government's ambitious goals. The World Bank's role is emphasized in supporting the country's development through strategic recommendations and simulation scenarios.
试读结束,高清完整版pdf/doc/ppt,请点下载