2010年-世界发展银行全球_Addressing_Key_Environmental_Hazards_After_an_Earthquake_6页_674kb
报告摘要
EAP DRM KnowledgeNotes Summary
Core Content
This working paper provides insights into environmental hazards and management practices following earthquakes, with a focus on the East Asia and the Pacific region. It draws on international experiences to highlight key issues and lessons learned in post-earthquake recovery and reconstruction, offering recommendations to ensure environmentally appropriate actions.
Key Issues in Post-Earthquake Environmental Management
-
Debris Removal:
- Materials can be benign or hazardous.
- Examples of hazardous materials include asbestos, stored fuels, medical wastes, and possibly radioactive materials.
- Local communities should be involved in decisions regarding material reuse.
-
Reconstruction Impact:
- Increased demand for construction materials can lead to deforestation and ecosystem degradation.
- Large-scale reconstruction may cause pollution, expanded settlement in risky areas, and watershed degradation.
-
Cultural Properties:
- Special attention is needed to identify and protect damaged sites and structures.
-
Dead Livestock:
- Can pose health risks due to disease vectors and contamination from decomposition.
-
Worker Safety:
- Emergency workers face risks from unstable structures and hazardous material leaks.
-
Worker Infrastructure Requirements:
- The presence of a large number of workers increases pressure on water, wastewater, and solid waste systems already damaged by the earthquake.
-
Dust and Noise:
- Similar to traditional construction projects, these can contribute to pollution.
-
Erosion:
- Earth movements may destabilize land, leading to road destruction, dam weakening, and loss of critical habitats.
-
Altered Drainage Patterns:
- Surface alterations can increase flooding in previously safe areas and clog drainage systems.
-
Industrial Pollution:
- In regions like Sichuan, the risk of hazardous material leaks from storage or processing facilities is significant, posing both immediate and long-term environmental and health risks.
Lessons Learned
-
Debris Removal:
- Not all debris must be disposed of; some can be recycled.
- Engage local communities in decisions about material reuse.
-
Cultural Properties:
- Rehabilitation efforts must involve knowledgeable and experienced personnel.
-
Reconstruction Impact:
- Environmental impact assessments (EIAs) should be integrated into reconstruction planning at both program and project levels.
- A participatory approach ensures that the priority concerns of victims are addressed.
-
Damage Assessments:
- Accurate and realistic assessments are crucial to avoid overbuilding and waste.
- Inaccurate assessments can lead to leaks of hazardous materials or equipment failure.
-
NGO Involvement:
- Inexperienced NGOs may cause more harm than good. Their efforts should be carefully monitored and guided.
-
Infrastructure Focus:
- Prioritize reconstruction and rehabilitation of existing infrastructure over new projects, as new infrastructure typically requires longer approval processes.
Recommendations
-
Develop guidelines for environmentally appropriate procedures in emergency reconstruction, covering:
- Demolition waste management
- Erosion control
- Transport and storage of construction materials
- Damage assessment for industrial facilities
- Management of hazardous solids and liquids
- Disposal of animal carcasses
- Structures of cultural significance
- Noise and dust control
- Biodiversity impact assessment
-
Introduce expedited environmental impact assessment procedures, including strategic environmental assessments, to address cumulative and sector-wide effects.
-
Prepare a priority program for industrial facility reconstruction in accordance with Chinese environmental standards.
-
Initiate training programs for workers and NGOs on environmentally sound practices during emergency recovery.
-
Develop a domestic animal carcass disposal and collection program.
-
If necessary, create a hazardous waste management program.
Case Studies
-
Mexico (1986):
- Focused on housing, schools, and ancillary services.
- Environmental issues included protection of cultural properties.
- Project design considered environmental eligibility and required prior Bank review of subprojects.
-
Turkey (1999):
- Centered on housing, small businesses, and essential infrastructure.
- Environmental management plan (EMP) was developed, addressing land clearance, worker impacts, and proper infrastructure design.
-
Colombia (2000):
- Reconstructed homes and infrastructure.
- EMP included guidelines for environmental management during activities.
- Implementation Completion Report emphasized the need to avoid inexperienced NGOs.
World Bank and GFDRR
- The World Bank, through the East Asia and the Pacific Disaster Risk Management Team, produced this note as part of a series on post-disaster recovery following the 2008 Wenchuan Earthquake.
- The content was coordinated by the China and Mongolia Sustainable Development and Country Management Units.
- The report acknowledges support from various partners, including countries and international organizations, for the Global Facility for Disaster Reduction and Recovery (GFDRR).