ASEAN Power Grid Interconnections Project Summary
Core Content
The ASEAN Power Grid (APG) Interconnections Project Profiles document outlines the status and details of 18 prioritised interconnection projects across the ASEAN region, as identified in the ASEAN Interconnection Masterplan Study (AIMS) III. These projects aim to enhance regional power grid interconnectivity, support renewable energy integration, and promote cross-border electricity trade. The document is prepared by the ASEAN Centre for Energy (ACE) in collaboration with the Heads of ASEAN Power Utilities/Authorities (HAPUA) Working Group 2 and endorsed by the 42nd ASEAN Ministers on Energy Meeting (AMEM).
Main Interconnection Projects
1. Peninsular Malaysia – Singapore
- Type: Existing & Planned
- Implementing Agencies: Tenaga Nasional Berhad (TNB) & Singapore Power
- Current Capacity: 525 MW (Existing)
- Planned Capacity: 525 MW (Planned)
- Total Capacity: 1,050 MW
- AIMS III Projection (2040): 1,050 MW
- Technical Specifications:
- Connecting Substations: Plentong (MY) – Woodlands (SG)
- Voltage: 230 kV (Existing), 230 kV (Planned)
- Transmission System: HVAC (Existing), HVDC (Planned)
- Potential Renewable Sites:
- Kangar, Perlis, Malaysia: 810 MWDC, 1,107.59 GWh/year, 19.50% capacity factor
2. Thailand – Peninsular Malaysia
- Type: Existing & Planned
- Implementing Agencies: EGAT & TNB
- Current Capacity: 380 MW (Existing)
- Planned Capacity: 1,600 MW
- Total Capacity: 1,043 MW
- AIMS III Projection (2040): 1,043 MW
- Technical Specifications:
- Connecting Substations: Khlong Ngae (TH) – Gurun (MY)
- Voltage: 300 kV
- Transmission System: HVDC
- Potential Renewable Sites:
- Kangar, Perlis, Malaysia: 810 MWDC, 1,107.59 GWh/year, 19.50% capacity factor
- Tambon Tha Chai, Thailand: 1,180 MWDC, 1,713.74 GWh/year, 20.60% capacity factor
3. Peninsular Malaysia – Sarawak
- Type: Planned
- Implementing Agencies: TNB & Sarawak Energy
- Planned Capacity: 1,600 MW
- AIMS III Projection (2040): 695 MW
- Technical Specifications:
- Connecting Substations: Telok Gong (MY) – Perawang (ID)
- Voltage: 500 kV
- Transmission System: HVDC
- Potential Renewable Sites:
- Kangar, Perlis, Malaysia: 810 MWDC, 1,107.59 GWh/year, 19.50% capacity factor
- Lampung, Indonesia: 4,360 MWDC, 5,519.25 GWh/year, 18.00% capacity factor
4. Sarawak – Kalimantan
- Type: Existing
- Implementing Agencies: Sarawak Energy & PLN
- Current Capacity: 230 MW
- AIMS III Projection (2040): 830 MW
- Technical Specifications:
- Connecting Substations: Mambong (MY) – Bengkayang (ID)
- Voltage: 275 kV
- Transmission System: HVAC
- Potential Renewable Sites:
- Sri Aman, Sarawak, Malaysia: 1,150 MWDC, 1,443.55 GWh/year, 18.00% capacity factor
- Kalimantan Tengah, Indonesia: 6,875 MWDC, 8,949.81 GWh/year, 18.70% capacity factor
5. Philippines – Sabah
- Type: Planned
- Implementing Agencies: SESB & TransCo
- Planned Capacity: 196 MW
- AIMS III Projection (2040): 196 MW
- Technical Specifications:
- Connecting Substations: Kudat (MY) – Palawan (PH)
- Voltage: 275 kV
- Transmission System: HVDC
- Potential Renewable Sites:
- Tigbauan, Iloilo, Philippines: 535.3 MW, 1,718.44 GWh/year, 36.6% load factor
6. Sabah – Sarawak
- Type: Planned
- Implementing Agencies: SEB & SESB
- Planned Capacity: 30–50 MW
- AIMS III Projection (2040): 177 MW
- Technical Specifications:
- Connecting Substations: Lawas (Sarawak) – Mengalong (Sabah)
- Voltage: 275 kV
- Transmission System: HVAC
- Potential Renewable Sites:
- Sri Aman, Sarawak, Malaysia: 1,150 MWDC, 1,443.55 GWh/year, 18.00% capacity factor
7. Sarawak – Brunei Darussalam
- Type: Planned
- Implementing Agencies: SEB & DES
- Planned Capacity: TBC
- AIMS III Projection (2040): 177 MW
- Technical Specifications:
- Connecting Substations: Tudan (Sarawak/MY) – Lumut (BN)
- Voltage: 275 kV
- Transmission System: HVAC
- Potential Renewable Sites:
- Sri Aman, Sarawak, Malaysia: 1,150 MWDC, 1,443.55 GWh/year, 18.00% capacity factor
8. Thailand – Lao PDR
- Type: Existing & Planned
- Implementing Agencies: EGAT & EdL
- Existing Capacity: 955 MW
- Planned Capacity: TBC
- Total Capacity: 955 MW
- AIMS III Projection (2040): 700 MW
- Technical Specifications:
- Existing Interconnections: 6 projects (e.g., Tha Li - Ken Thao, Nong Khai - Dongphosy, etc.)
- Voltage: 115/230 kV
- Transmission System: HVAC
- Planned Interconnection: Mae Chan (TH) – Ton Pheung (LA)
9. Lao PDR – Vietnam
- Type: Planned
- Implementing Agencies: EdL & EVN
- Planned Capacity: TBC
- AIMS III Projection (2040): 625 MW
- Technical Specifications:
- Connecting Substations: TBC
- Voltage: TBC
- Transmission System: TBC
- Potential Renewable Sites:
- TBC
10. Thailand – Myanmar
- Type: Planned
- Implementing Agencies: EGAT & Myanmar Electricity Authority
- Planned Capacity: 365 MW
- AIMS III Projection (2040): 1,262 MW
- Technical Specifications:
- Connecting Substations: TBC
- Voltage: TBC
- Transmission System: TBC
- Potential Renewable Sites:
- TBC
11. Vietnam – Cambodia
- Type: Planned
- Implementing Agencies: EVN & CEA
- Planned Capacity: TBC
- AIMS III Projection (2040): 1,353 MW
- Technical Specifications:
- Connecting Substations: TBC
- Voltage: TBC
- Transmission System: TBC
- Potential Renewable Sites:
- TBC
12. Lao PDR – Cambodia
- Type: Planned
- Implementing Agencies: EdL & CEA
- Planned Capacity: TBC
- AIMS III Projection (2040): 625 MW
- Technical Specifications:
- Connecting Substations: TBC
- Voltage: TBC
- Transmission System: TBC
- Potential Renewable Sites:
- TBC
13. Thailand – Cambodia
- Type: Planned
- Implementing Agencies: EGAT & CEA
- Planned Capacity: 650 MW
- AIMS III Projection (2040): 1,315 MW
- Technical Specifications:
- Connecting Substations: TBC
- Voltage: TBC
- Transmission System: TBC
- Potential Renewable Sites:
- TBC
14. Sabah – Kalimantan
- Type: Planned
- Implementing Agencies: SESB & PLN
- Planned Capacity: TBC
- AIMS III Projection (2040): 174 MW
- Technical Specifications:
- Connecting Substations: Kudat (MY) – Kalimantan (ID)
- Voltage: TBC
- Transmission System: TBC
- Potential Renewable Sites:
- TBC
15. Sumatera – Singapore
- Type: Planned
- Implementing Agencies: TNB & Singapore Power
- Planned Capacity: TBC
- AIMS III Projection (2040): 1,133 MW
- Technical Specifications:
- Connecting Substations: TBC
- Voltage: TBC
- Transmission System: TBC
- Potential Renewable Sites:
- TBC
16. Internal Indonesia (Java – Kalimantan)
- Type: Planned
- Implementing Agencies: PLN
- Planned Capacity: TBC
- AIMS III Projection (2040): 435 MW
- Technical Specifications:
- Connecting Substations: TBC
- Voltage: TBC
- Transmission System: TBC
- Potential Renewable Sites:
- TBC
17. Sumatera – Java
- Type: Planned
- Implementing Agencies: PLN
- Planned Capacity: 2,600 MW
- AIMS III Projection (2040): 10,000 MW
- Technical Specifications:
- Connecting Substations: TBC
- Voltage: TBC
- Transmission System: TBC
- Potential Renewable Sites:
- TBC
Key Benefits of Enhancing Interconnectivity
-
Renewable Energy Capacity and Share:
- Increased capacity for cross-border renewable energy exchange.
- Identified potential solar and wind sites for integration into the APG.
-
Socio-Environmental Impact:
- Promotes sustainable development by enabling cleaner energy sources.
- Reduces reliance on fossil fuels and enhances energy security.
-
Economic Impact:
- Facilitates power trade and reduces electricity costs.
- Supports regional economic growth and energy market integration.
Way Forward
- The AIMS III study provides a roadmap for future interconnections.
- Feasibility studies are ongoing for several planned projects.
- Upgrades and expansions are required for existing interconnections to meet future energy demands.
- Continued support from development partners and international organisations is essential for the successful implementation of the APG.
Summary Table
| No | Connection | Existing (MW) | Ongoing (MW) | Future (MW) | Total (MW) | AIMS III Projection (2040) |
|---|---|---|---|---|---|---|
| 1 | Peninsular Malaysia – Singapore | 525 | 525 | TBC | 1,050 | 1,050 |
| 2 | Thailand – Peninsular Malaysia | 380 | - | TBC | 380 | 1,043 |
| 3 | Sarawak – Peninsular Malaysia | - | - | 1,600 | 1,600 | 695 |
| 4 | Peninsular Malaysia – Sumatera | - | - | 600 | 600 | 2,130 |
| 5 | Sarawak – Kalimantan | 230 | - | - | 230 | 777 |
| 6 | Philippines – Sabah | - | - | 500 | 500 | 196 |
| 7 | Sarawak – Brunei | - | TBC | TBC | TBC | 177 |
| 8 | Sabah – Kalimantan | - | - | TBC | TBC | 174 |
| 9 | Thailand – Lao PDR | 955 | - | TBC | 955 | 700 |
| 10 | Lao PDR – Vietnam | - | - | TBC | TBC | 625 |
| 11 | Thailand – Myanmar | - | - | 365 | 365 | 1,262 |
| 12 | Vietnam – Cambodia | 200 | - | TBC | 200 | 1,353 |
| 13 | Lao PDR – Cambodia | 300 | - | TBC | 300 | 625 |
| 14 | Thailand – Cambodia | 250 | - | 650 | 900 | 1,315 |
| 15 | East Sabah – North Kalimantan | - | - | TBC | TBC | 174 |
| 16 | Sumatera – Singapore | - | - | TBC | TBC | 1,133 |
| 17 | Lao PDR – Myanmar | 30 | - | 100–600 | 130–630 | 624 |
| 18 | Internal Indonesia | - | - | - | - | - |
| a | Java – Kalimantan | - | - | TBC | TBC | 435 |
| b | Sumatera – Java | - | - | 2,600 | 2,600 | 10,000 |
Disclaimer
- The list of interconnection projects is based on country priorities and AIMS III assessments.
- The data is subject to updates based on new project nominations or changes in AIMS.
- The map is for illustrative purposes only.
- Renewable energy sites are identified based on AIMS III Phase 1 and country PDPs.