Executive Summary
Germany aims to achieve climate neutrality by 2045, requiring expanded flexibility measures in its electricity system. Flexibility refers to the ability to adjust generation/load to address variability from renewable energy sources (like wind and solar PV), particularly due to high residual load gradients (up to 10 percentage points).
Flexibility options include:
- Technical measures: Retrofitting conventional power plants (coal, gas), biomass/biogas plants, and battery storage (e.g., 450 MW conventional capacity flexibility, 3 GW+ projected for batteries).
- Demand-Side Flexibility: Industrial, commercial, and residential (e.g., demand-response from 2,416 MW to potential 7–21 GW).
- System Operation: Increased use of redispatch (*~*16.7 TWh in 2019) and curtailment, grid expansion, and cross-border interconnectors (e.g., NordLink cable).
- Market Design: Granular markets and ancillary services (e.g., primary/secondary control energy, bid increments starting at 0.1 €/MWh).
Key Analytical Findings
1. Retrofit Conventional Power Plants
- Hard Coal Plants: PMin ~40%, ramp rate ~3–5% Pn/min, t ~1.5–3.5 h.
- Lignite Plants: PMin ~50–60%, ramp rate ~1–4% Pn/min, t ~4–10 h.
- Gas Plants: PMin ~20–30%, ramp rate ~8–12% Pn/min, t near 0.1 h (highest flexibility).
2. Other Technical Options
- Biomass/Biogas: High potential (~5 GW in 2018, ~16 GW by 2030), incentivized by flexibility premiums (€40–130/kW/year).
- Pumped-Storage: Installed capacity ~6.7 GW, projected expansion to 12 GW by 2025.
- Batteries/Large-Scale Storage: 450 MW in 2019, ~5 GW more stable to delivdrastically reduced curtailment volumes through grid expansion and redispatch 2.0 reforms.
3. Demand-Side Flexibility
- Interruption Potential: 2,416 MW pre-qualified, expanding to 15 GW by 2030 via smart meters and digital tariffs.
4. Market and Regulatory Toolkit
- Ancillary Services: Market-based control energy auctions (Primary: 30s ramp, Secondary: 5-min, Tertiary: 15-min).
- Grid Boosters: LSBs/DSA contracted (up to €0.5/MWh for load).
- Support Schemes: EEG supplements (€40–65/kW/year), with renewables now eligible for grid boosters.
- Cross-Border Exchanges: Increases through infrastructure like NordLink (1.4 GW).
Conclusion
- Total Flexibility Capacity: Supports >15 GW of additional flexibility by 2030, centralizing storage through virtual power plants.
- Key Obstacles:
- Fragmented regulatory incentives
- Grid bottlenecks limiting storage deployment
- Persisting high investment costs for retrofits (€400–1,400/kW for PtX systems)
- Priority Actions:
- En shorthen flexibility prequalification/market integration.
- Accelerate grid expansion and ammonia/PtX pilot projects.
Citations: Agora Energiewende, dena 2021, BMWi 2021.