This policy note evaluates the impact of the World Bank's Poverty Reduction Support Credit (PRSC) Budget Support Instrument (BSI) on rural water supply and sanitation in Uganda. The study is based on a 2004 analysis of the first three years of BSI implementation and includes insights from various stakeholders such as the World Bank, the Directorate of Water Development (DWD), district water officials (DWOs), and community members.
Main Findings
1. Pace and Nature of Delivery
- The BSI did not significantly accelerate the pace of rural water service delivery compared to the pre-PRSC period.
- Coverage increased at a similar rate, but the number of boreholes drilled decreased, while the protection of shallow wells increased.
- Shallow wells are cost-effective but may not be perennial and require close monitoring to ensure water quality and sustainability.
2. Management Information System (MIS)
- The GOU has a MIS in place for tracking water points, including springs and wells.
- However, the system lacks consistency and accuracy, especially in reporting facilities constructed by non-governmental organizations (NGOs).
- Improving MIS is essential for reliable performance evaluation of the BSI.
3. Theoretical vs. Actual Coverage
- There is a discrepancy between theoretical and actual coverage due to overutilization of water points and limited NGO contributions.
- Field observations suggest that actual coverage is higher than design capacity, which could compromise the functionality of water systems.
- The "some for all" approach may lead to unsustainable usage and reduced system reliability.
4. Funds Release, Reporting, and Accountability
- The BSI requires at least 95% disbursement of allocated funds, which was met in the first two years.
- However, in FY 2003/2004, the Ministry of Finance and Economic Planning (MOFEP) delayed fund releases, affecting district implementation.
- Delays in fund disbursement led to disappointment among contractors and communities, undermining trust in the system.
5. District-Level Governance
- Districts have the capacity to implement and manage their District Development Plans (DDPs) under the BSI.
- The DWD and TSU provide technical and financial support, but the 12-month project cycle is too short for complex projects.
- Extending the planning horizon and increasing grant ceilings could improve district-level management of larger investments.
6. Spending on Rural Water Supply
- DWSDG allocations increased unevenly across districts, with significant disparities in funding per unserved person.
- Some districts received as little as UGS 1.55 per unserved person, while others received up to UGS 63.35.
- The FDS is being used to promote more equitable distribution of funds.
7. Role of the Private Sector
- The private sector can contribute to rural water supply but faces challenges such as high procurement costs and lack of transparency.
- Tendering guidelines are perceived as cumbersome, increasing the cost of doing business.
- A more streamlined and transparent procurement process is needed to improve efficiency and attract private investment.
8. Community Development and Mobilization
- Communities are involved in the planning and maintenance of water schemes, but participation is uneven.
- Some communities contribute to the initial infrastructure costs (CCCC) and assist with maintenance.
- Training and incentives could encourage greater community involvement in operations and maintenance (O&M).
9. Operations and Maintenance (O&M)
- O&M strategies are not fully developed, and there is ambiguity about ownership of water schemes.
- Many rural communities are not prepared to take full responsibility for O&M, which affects sustainability.
- A clear O&M strategy is needed to ensure long-term functionality of water supply systems.
10. Cost Escalation and Spending
- The per capita cost of rural water supply increased slightly despite the use of low-cost technologies.
- There is a gap between projected and actual costs, which may indicate inefficiencies in the system.
- Without cost transparency and efficiency improvements, it will be difficult to accelerate service delivery.
Key Recommendations
1. Further Support to the PRSC
- The PRSC should continue to receive support to improve its effectiveness.
- The FDS should be used to ensure more equitable distribution of funds among districts.
- The rural sector should receive a larger share (35% instead of 25%) of government resources to meet PEAP targets.
2. RGC Management
- The responsibility for mechanized water systems in RGCs should be transferred to DWOs.
- Technical support should be institutionalized to help DWOs manage more complex systems.
- Economic and social aspects of RGC management should be handled by DWOs, requiring more resources for O&M.
3. Planning Horizon
- The planning horizon for water projects should be extended to allow for more comprehensive planning and implementation.
- DDPs should be fully integrated with the budgeting process to ensure long-term sustainability.
4. Technical Support
- A technical support structure is needed to handle complex projects such as small piped systems (SPS).
- Roles and responsibilities of all stakeholders (DWD, TSU, DWOs, private sector, etc.) should be clearly defined.
5. Supply Chain Development
- A standardized pricing system for drilling and BoQ items should be adopted to streamline the contracting process.
- Joint contracts with drilling companies can lead to economies of scale and faster service delivery.
6. Procurement Process
- The DWD should develop practical and enforceable procurement guidelines.
- Decentralized procurement should be more flexible to improve quality and sustainability of water source protection.
7. Monitoring and Evaluation (M&E)
- Strengthening M&E mechanisms is crucial for tracking progress and identifying inefficiencies.
- The M&E process should be integrated with the planning and budgeting cycle to ensure accountability and transparency.
8. Equity Among Districts
- Efforts should be made to ensure more equitable allocation of resources to districts.
- The FDS and other mechanisms should be used to address disparities in funding and service delivery.
9. O&M Strategy
- A more comprehensive and effective O&M strategy is needed to ensure the long-term sustainability of water schemes.
- Ownership of schemes should be clearly defined to improve community responsibility and maintenance.
Conclusion
The BSI has played a significant role in Uganda's rural water supply and sanitation sector, although challenges remain in terms of implementation speed, equity in funding, and long-term sustainability. Strengthening the planning process, improving transparency in procurement, and enhancing O&M strategies are essential for the continued success of the BSI and the overall development of the sector. The involvement of communities and the private sector, along with improved coordination at the district level, will be critical to achieving the Millennium Development Goals (MDG) in this area.