Summary of "Supply Chain Delays and Uncertainty in India: The hidden constraint on manufacturing growth"
Core Content
This report, titled Supply Chain Delays and Uncertainty in India: The hidden constraint on manufacturing growth, focuses on the impact of supply chain inefficiencies, particularly freight and logistics delays, on India's manufacturing sector. It argues that while significant investments in infrastructure are being made, the primary constraint on manufacturing growth is not the physical infrastructure itself, but the regulatory environment that creates delays and uncertainty in freight movement.
The study combines a review of existing literature with a new survey of 69 manufacturing firms across four industries: auto-components, textiles, electronics, and heavy engineering. The key findings highlight that regulatory barriers and checkpoints significantly affect the performance of the freight industry, often more than the physical conditions of roads or ports.
Main Points
-
Logistics Costs and Manufacturing: Logistics costs are a major component of manufacturing costs in India, often exceeding the costs of electricity and labor. These costs are not only direct but also include indirect costs such as inventory holding, lost sales, and the need for emergency shipments.
-
Time and Uncertainty: A significant portion of freight journey time is spent on regulatory stoppages, not actual movement. For instance, less than half of the average domestic freight journey is spent on the road, with the rest consisting of rest periods, toll plazas, and check posts.
-
Impact of State Borders: State borders are a major source of delay and uncertainty. The number of state border crossings can add a week of uncertainty to delivery schedules. This is particularly problematic for young and small companies, which are more affected by customs and border clearance procedures.
-
Regulatory Barriers: Regulatory barriers such as taxes, checkpoints, and customs procedures are the main causes of delays. These include sales and entry taxes, regional transport offices (RTOs), commercial and VAT checkpoints, excise taxes, and forestry clearances.
-
Comparative Analysis: The average time for customs clearance is about 4 days, but this varies significantly among ports. International freight, such as imports and exports, faces even greater delays, with an average import shipment taking 4.5 weeks and exports 4.1 weeks.
-
Reform Priorities: The report emphasizes that a few major reforms could have a greater impact on manufacturing growth than massive infrastructure investments. Key reforms include the implementation of a Goods and Services Tax (GST), reducing checkpoints, and improving customs and domestic inspection systems.
Key Information
-
Average Freight Times:
- Inbound freight: 2.7 days (standard deviation 2.2 days)
- Outbound freight: 3.7 days (standard deviation 2.6 days)
- Customs clearance: ~4 days (median 3.5 days)
- International import: ~4.5 weeks
- International export: ~4.1 weeks
-
Regulatory Impact:
- Regulatory stoppages account for about a quarter of the journey time.
- State borders are a major cause of delay and uncertainty, with two border crossings potentially adding a week to delivery schedules.
- The time spent on the road is only about 40% of the total journey time.
-
Industry-Specific Data:
- Auto components: 44% of companies export finished goods (FG), 67% import raw materials (RM)
- Textile: 61% of companies export FG, 17% import RM
- Electronics: 71% of companies export FG, 88% import RM
- Heavy Engineering: 81% of companies export FG, 63% import RM
-
Buffer Stock and Inventory:
- On average, 43 days of inventory is maintained across the four industries.
- About 27% of this inventory is buffer stock, which is a direct result of supply chain uncertainty.
- Regulatory issues can increase buffer stock by almost doubling inventory holding periods.
-
Infrastructure vs. Regulation:
- While infrastructure is important, the study shows that regulatory barriers have a more substantial impact on logistics performance.
- Even with improved road conditions, the time saved is limited due to the significant proportion of time spent on regulatory stoppages.
-
Reform Urgency:
- The introduction of GST is highlighted as a critical reform.
- State-level actions to reduce checkpoints and improve customs procedures are also emphasized.
- The report suggests that these reforms could yield significant economic benefits, especially for low-income states.
Conclusion
The report concludes that addressing regulatory barriers is crucial for improving the performance of the freight and logistics industry in India. This, in turn, will enhance the competitiveness of the manufacturing sector, particularly in global value chains. It calls for sustained engagement among states to implement and follow up on these reforms, emphasizing the need for feedback mechanisms to ensure that policies are effectively implemented at the ground level.
The urgency and potential for reform are underscored, as current regulations are constraining the gains in total factor productivity (TFP) that could be achieved through modernizing the freight system. The study highlights that without such reforms, the manufacturing sector in India is unlikely to meet its growth targets and will remain fragmented and stunted.