2025-03-18-莱坊-Healthcare_Development_Opportunities_2025_16页_4mb
报告摘要
Healthcare Sector Summary: 2025 UK Care Home Supply and Development Opportunities
Core Content
The UK healthcare sector, particularly the elderly care home market, is experiencing a growing demand due to an ageing population and the need for improved care facilities. Despite this, the supply of care homes has not kept pace with demand, leading to a potential deficit in the coming years.
Key Trends and Statistics
-
Supply Growth:
- Total bed supply has increased by only 86 beds since the last analysis.
- Over the last decade, bed supply has grown by 2.9%, while the over-65 population has grown by 20.7%.
- Deregistrations have continued, with a 1.3% leakage of supply over the past 12 months.
-
Existing Stock:
- 76% of care homes are over 20 years old.
- 29% of beds lack en suite facilities, and 70% lack full wet rooms.
- 27% of homes are converted from other uses and may be outdated.
- 19% of homes are rated "requires improvement" or "inadequate" by the CQC.
-
New Builds:
- In 2024, new care home completions dropped by 36% compared to 2023.
- There were 17% more planning schemes in 2024, suggesting a promising pipeline.
- The Midlands (East and West) have seen the most new beds regionally.
Development Hotspots Index
-
Index Overview:
- The index evaluates counties in England, Wales, and Scotland based on eight variables: demographic and economic projections, wealth, future supply pipeline, land values, and operational performance.
- Cambridgeshire and South Glamorgan are the top counties in England and Wales, respectively.
- London no longer ranks in the top five due to its fragmented land values.
-
Key Rankings:
- Cambridgeshire: Total score index 1.32
- South Glamorgan: Total score index 1.52
- Lothian: Total score index 1.23
- Greater Manchester: Total score index 1.24
- Tyne & Wear: Total score index 0.98
Demand for Care
-
Occupancy and Fill Rates:
- New care homes typically take 2 years to reach full occupancy.
- High-quality sites may achieve full occupancy in 18 months, while others may take 4 years.
- 26.7 beds per 100 people over 85 is the average supply.
-
Care Usage Multipliers:
- People over 85 account for 13.5% of the over-65 population but 51% of care demand.
- This highlights the importance of targeting high-quality, future-proof care homes.
Key Insights from Freddie Richards
-
Supply Shortfall:
- The sector is not building enough new homes to meet demand.
- Existing stock is often outdated and unsafe, necessitating more new developments.
-
Home Sizing:
- The sweet spot is between 60 and 80 beds, though smaller and larger homes can also be viable.
- Europe often has larger homes, but the UK market favors mid-sized facilities.
-
Operator Preferences:
- Strong commissioning teams are preferred for new developments.
- Operators with experience in forward funding and pre-let deals are particularly valuable.
-
ESG Considerations:
- The sector is strong in Social aspects but lags in Environmental performance.
- There is a need to focus on biodiversity net gain and Scope Three emissions reporting.
-
Site Selection:
- Key factors include population density, staff availability, and competition.
- A strong operator can overcome site limitations.
-
Debt and Funding:
- While the cost of debt impacts development viability, the sector is seeing more innovative funding options.
- Low gearing among investors means the market is more accessible.
-
Retention of Older Homes:
- There is potential to refurbish and extend older assets to support supply growth.
- However, smaller homes are unlikely to deliver quality care and should be phased out.
-
Future Projections:
- By 2050, the UK is expected to face a shortfall of around 200,000 beds.
- En suite beds are already in deficit, with a significant portion of current stock lacking these features.
Conclusion
- The UK care home market is at a critical juncture, with a growing demand and limited supply.
- A combination of new developments and refurbishment of existing stock is essential to address the supply gap.
- Cambridgeshire and South Glamorgan are highlighted as the most promising regions for new care home development.
- The sector must adapt to ESG requirements and focus on future-proof design to meet the needs of an ageing population.
展开完整摘要
试读结束,高清完整版pdf/doc/ppt,请点下载