2014年-世界发展银行全球_Pakistan_Earthquake_2005___The_Case_of_Centralized_Recovery_Planning_and_Decentralized_Implementation_44页_10mb
报告摘要
Summary of the 2005 Pakistan Earthquake Case Study
Core Content
The 2005 Pakistan earthquake, measuring 7.6 on the Richter scale, struck the regions of Azad Jammu and Kashmir (AJK) and Khyber Pakhtunkhwa (KPK), causing unprecedented devastation. It resulted in 73,000 deaths, 128,309 injuries, and left 3.5 million people homeless. The earthquake damaged critical sectors such as housing, education, transport, health, and agriculture, with an estimated total damage of USD 3.5 billion and indirect income losses of USD 576 million. The overall economic impact was 2.91% of Pakistan's GDP.
The Government of Pakistan (GOP) responded by establishing the Earthquake Reconstruction and Rehabilitation Agency (ERRA) to lead, coordinate, and oversee the reconstruction efforts. This marked the first systematic and participatory Damage and Needs Assessment (DNA) in the country, conducted in partnership with the Asian Development Bank (ADB) and the World Bank. The DNA provided a comprehensive estimate of needs and coherent recovery strategies, which were instrumental in securing USD 6.2 billion in donor pledges, ensuring the reconstruction program was well-funded from the outset.
Main Points and Key Information
1. Reconstruction Needs Overview
- The earthquake caused the worst destruction in Pakistan's history.
- Relief, early recovery, and reconstruction costs were estimated at USD 5.198 billion.
- Private housing accounted for 44% of the total reconstruction needs, followed by education (13%), transport (12%), health and agriculture (9% each).
- A total of 8 districts in AJK and KPK were most affected.
2. Recovery Planning Approach and Process
- The GOP adopted a simultaneous and integrated four-pronged approach for recovery planning.
- This approach allowed for phased implementation and reduced planning time compared to traditional methods.
- It ensured the inclusion of key stakeholders from the beginning of the planning process.
- The approach involved parallel and overlapping timelines for various recovery activities.
3. Policy Framework for Recovery
- The GOP articulated strategic objectives for the reconstruction program, including building back better, converting adversity into opportunity, and pro-poor recovery.
- The Building Back Better (BBB) principle emphasized seismic resilience and needs-based reconstruction.
- The Converting Adversity into Opportunity principle aimed at modernizing and improving infrastructure.
- The Pro-Poor Recovery principle focused on equitable access to resources and services, particularly for vulnerable groups such as women, children, and the disabled.
4. Institutional Framework
- ERRA was established to lead and coordinate the reconstruction process.
- The District Reconstruction Units (DRUs) were set up to implement recovery at the local level.
- A multi-stakeholder consultation process was initiated to ensure inclusivity and consensus in recovery planning.
5. Recovery Financing
- The DNA provided a credible estimate of resource requirements, allowing for strategic financial planning.
- The program was amply funded through donor pledges, with a total of USD 6.2 billion pledged.
- Financing mechanisms were developed to ensure efficient and effective implementation.
6. Implementation Arrangements
- Work plans were designed by ERRA, and implemented by NGOs, contractors, and pre-qualified engineering firms.
- Community engagement was a key element, especially in housing reconstruction.
- Legal assistance was provided to resolve land disputes and protect vulnerable populations.
7. Monitoring and Evaluation
- A baseline for monitoring and evaluation was established based on the DNA.
- Key Performance Indicators (KPIs) were developed to track progress and ensure transparency and accountability.
8. Grievance Redressal and Coordination
- Grievance redressal mechanisms were put in place to address public concerns and expectations.
- Coordination and communication were ensured through intergovernmental forums and stakeholder dialogue.
9. Role of Leadership and Crisis Management
- The President's office played an active role in setting basic recovery guidelines.
- Leadership was crucial in ensuring a coherent and effective recovery strategy.
10. Good Practices and Lessons Learned
- Early and credible assessment was vital in setting the foundation for recovery planning.
- Community participation and local ownership were emphasized in reconstruction efforts.
- Decentralized implementation was adopted to ensure local relevance and efficiency.
- Inclusivity was a key focus, with special attention to vulnerable groups.
- Sectoral strategies were developed to ensure comprehensive and coordinated recovery.
- Cross-sectoral prioritization was used to address the most urgent needs first.
Key Takeaways
- The 2005 earthquake was a catalyst for comprehensive and participatory recovery planning in Pakistan.
- ERRA played a central role in leading and coordinating the reconstruction process.
- The four-pronged approach enabled efficient and effective recovery despite the scale and complexity of the disaster.
- Pro-poor and inclusive recovery was a guiding principle, ensuring equitable access to resources and support for vulnerable populations.
- The policy and institutional framework laid the groundwork for long-term resilience and sustainable development.
- Community engagement and legal support were critical in ensuring fair and transparent reconstruction.
试读结束,高清完整版pdf/doc/ppt,请点下载